# Real Fed Funds Rate Implied Index (RFED) Methodology

Adjacent Markets, Inc.- Version 1.0

Adjacent uses AI and agents to assist with methodology development under [Adjacent’s AI Disclosure Policy](https://adjacent.markets/static/ai-disclosure-policy). Humans remain responsible for themes, product decisions, and publication readiness.

## Table of Contents

- [1. Executive Summary](#1-executive-summary)
- [2. Index Overview](#2-index-overview)
  - [2.1 Objective](#21-objective)
  - [2.2 Index Name and Identifier](#22-index-name-and-identifier)
  - [2.3 Design Principles](#23-design-principles)
  - [2.4 Target Users and Use Cases](#24-target-users-and-use-cases)
- [3. Universe Definition](#3-universe-definition)
  - [3.1 Eligible universe](#31-eligible-universe)
  - [3.2 Admission tests](#32-admission-tests)
  - [3.3 Membership](#33-membership)
  - [3.4 Next reference period](#34-next-reference-period)
- [4. Data Sources](#4-data-sources)
  - [4.1 Primary data source](#41-primary-data-source)
  - [4.2 Which rate each clock uses](#42-which-rate-each-clock-uses)
  - [4.3 Official resolution](#43-official-resolution)
  - [4.4 Published values](#44-published-values)
- [5. Weighting Methodology](#5-weighting-methodology)
  - [5.1 Sleeve aggregation](#51-sleeve-aggregation)
  - [5.2 Live 50% bracket](#52-live-50-bracket)
- [6. Index Calculation](#6-index-calculation)
  - [6.1 Inception](#61-inception)
  - [6.2 Formula](#62-formula)
  - [6.3 Intraday marks](#63-intraday-marks)
  - [6.4 Resolution treatment](#64-resolution-treatment)
  - [6.5 Last valid implied](#65-last-valid-implied)
  - [6.6 Floor, upside, and rounding](#66-floor-upside-and-rounding)
  - [6.7 Performance convention](#67-performance-convention)
- [7. Index Maintenance](#7-index-maintenance)
  - [7.1 Update schedule](#71-update-schedule)
  - [7.2 Regular roll](#72-regular-roll)
  - [7.3 Market disruptions and data failures](#73-market-disruptions-and-data-failures)
  - [7.4 Voids, amendments, and corrections](#74-voids-amendments-and-corrections)
  - [7.5 Methodology review](#75-methodology-review)
- [8. Governance](#8-governance)
  - [8.1 Index Sponsor and Calculation Agent](#81-index-sponsor-and-calculation-agent)
  - [8.2 Adjacent Index Committee](#82-adjacent-index-committee)
  - [8.3 Meeting Schedule](#83-meeting-schedule)
  - [8.4 Methodology Changes](#84-methodology-changes)
  - [8.5 Conflicts of Interest](#85-conflicts-of-interest)
- [9. Risk Factors and Limitations](#9-risk-factors-and-limitations)
  - [9.1 Last-valid and listing-gap risk](#91-last-valid-and-listing-gap-risk)
  - [9.2 Live-bracket and next-decision risk](#92-live-bracket-and-next-decision-risk)
  - [9.3 Reference-period mismatch](#93-reference-period-mismatch)
  - [9.4 Marking and liquidity risk](#94-marking-and-liquidity-risk)
  - [9.5 Implementation cost and uninvestability risk](#95-implementation-cost-and-uninvestability-risk)
  - [9.6 Resolution and contract risk](#96-resolution-and-contract-risk)
- [10. Changelog](#10-changelog)
- [11. Approvals](#11-approvals)
- [12. Legal Notices and Disclaimers](#12-legal-notices-and-disclaimers)

## 1. Executive Summary

The Real Fed Funds Rate Implied Index (RFED) is a market-implied reading of the real federal funds rate, published as 100 minus that rate. The real federal funds rate is the federal funds rate minus inflation, in percentage points. RFED is quoted the way short-term interest rate futures are, as 100 minus a rate, so it rises when the implied real rate falls. The implied real rate falls when markets expect a lower federal funds rate, higher inflation, or both.

RFED is an Implied Level index with two sleeves. It ticks as event-contract markets reprice the next Federal Open Market Committee (FOMC) decision and the next inflation print, and each sleeve rolls forward ahead of its own event. A venue may list a future or perpetual that marks to RFED, and an ETF issuer may use it as the reference for a listed fund. Adjacent publishes the index only.

---

## 2. Index Overview

### 2.1 Objective

RFED is built from event contracts on two official figures: the upper bound of the federal funds target range set by the FOMC at each scheduled meeting, and the year-over-year change in the Consumer Price Index (CPI) published each month by the Bureau of Labor Statistics (BLS). The FOMC sets the target as a range 25 basis points wide. When the target range is 4.00% to 4.25%, the upper bound is 4.25%. The implied real rate is the implied federal funds rate, expressed as the midpoint of the target range, minus implied CPI inflation, in percentage points. The published index value is 100 minus the implied real rate.

The inflation sleeve tracks CPI inflation over the past twelve months. RFED subtracts the market’s implied reading of that twelve-month CPI figure from the market’s implied fed funds rate after the next FOMC decision.

### 2.2 Index Name and Identifier

- **Index name:** Real Fed Funds Rate Implied Index
- **Short name / ticker:** RFED
- **Index type:** Implied Level, as defined in [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology) (Section 6A). A published reading in official-print units, inferred from event-contract rates. RFED uses price interpolate.
- **Calculation unit:** index points, equal to 100 minus the implied real rate in percentage points
- **Sleeves:** federal funds target range (fed funds sleeve); CPI-U (Consumer Price Index for All Urban Consumers) year-over-year (inflation sleeve). Sleeve implied levels are in percentage points.
- **Official index value:** 100 minus the implied real rate, where the implied real rate is the fed funds sleeve, expressed as the target-range midpoint, minus the inflation sleeve.
- **Implied real rate:** a derived display value equal to 100 minus the official index value, in percentage points. Adjacent may show it alongside the index. It is not the official index value.

### 2.3 Design Principles

RFED is an Implied Level index with two sleeves. Each sleeve holds event contracts on how high the next official figure will be. Venues list these as thresholds, which pay if the figure is “at least X” or “above X,” or as single print bins, which pay only if that one listed outcome occurs. RFED uses the rates-layer ladder of “at least X” claims. Section 3.1 states how an “above X” threshold on the fed funds sleeve maps onto that ladder.

Each sleeve implied level is as defined in [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology) (Implied Level, Section 6A), under price interpolate. On the fed funds sleeve, that gives the implied upper bound of the target range. RFED then subtracts 0.125 percentage points to move that upper bound to the middle of the 25 basis point range. Banks lend to each other overnight at the effective federal funds rate, which trades inside the target range, near its middle. The middle of the range is a closer stand-in for that rate than the upper bound.

The implied real rate is the fed funds sleeve minus the inflation sleeve. The official index value is 100 minus the implied real rate. Section 5.2 applies these rules and gives a worked example.

Indicative values update every 60 seconds from the real-time rate. The fed funds sleeve uses contracts on one scheduled FOMC meeting at a time, the current reference meeting. The inflation sleeve uses contracts on one official CPI reference month at a time, the current reference month. Each changes only on that sleeve’s published roll calendar.

Calculation is gross of fees, spread, slippage, financing, and taxes. RFED is uninvestable. A third-party product may reference it; tracking difference is expected.

Sleeves are exchange-agnostic. The universe is the economic claim and its resolution rules, not a named venue.

### 2.4 Target Users and Use Cases

RFED may be useful to derivative venues, ETF issuers, market makers, risk managers, research users, and media. A venue may list a future, perpetual, or other derivative that marks to RFED. An ETF issuer may use RFED as the reference for a listed fund. Listing terms are outside this methodology.

---

## 3. Universe Definition

### 3.1 Eligible universe

RFED has two sleeves. Each sleeve is marked at the published rates in Section 4 for that sleeve’s series and reference period.

1. **Federal funds target range:** The claim is the upper bound of the federal funds target range announced by the FOMC at the conclusion of a scheduled meeting, in percent. The designated Yes on the rates-layer ladder is that this upper bound is at or above a listed level. The target range moves on a 25 basis point grid, so a claim that the upper bound is above X is the same claim as the upper bound being at least X + 0.25. For example, a claim that the upper bound is above 4.00% is the claim that it is at least 4.25%. When Section 5.2 selects the two strikes around 50 cents and applies price interpolate, it uses these “at least” levels, not the venue’s “above” labels. In the example, the pair is 4.25% and 4.50%, not 4.00% and 4.25%. Resolution is the target range published by the Board of Governors of the Federal Reserve System for that meeting (or the equivalent official source the rates layer binds to the same claim).
2. **Headline CPI year-over-year:** The claim is the BLS CPI-U, not seasonally adjusted, twelve-month percent change for the reference month. The designated Yes on the rates-layer ladder is that this print is at or above a listed numeric threshold. Resolution is the official BLS headline CPI year-over-year print for that month (or the equivalent official source the rates layer binds to the same claim).

Several venues may list contracts on the same official figure. When the resolution rules match (same series, same meeting or month, same official outcome), Adjacent publishes one blended rate for that claim. RFED uses that rate.

### 3.2 Admission tests

A reference period is admissible for a sleeve when all of the following hold:

- Contracts on that sleeve’s series and reference period are listed, or Adjacent already publishes a blended rate for that claim.
- Settlement is binary or otherwise unambiguous onto the official figure for that reference period.
- The contracts for that period are still open at admission, or that period is the current reference period during a published roll.
- At least one strike is listed for the reference period (Section 6A of [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology)), or a last valid implied level is on hand under Section 6.5.

For the fed funds sleeve, a reference period is a scheduled FOMC meeting. For the inflation sleeve, a reference period is a CPI reference month.

### 3.3 Membership

At each calculation interval the published value uses the current reference meeting for the fed funds sleeve and the current reference month for the inflation sleeve, including any in-progress roll weights under Section 7.2.

The current reference meeting is the next scheduled FOMC meeting whose roll has not completed. The current reference month is the next CPI reference month whose roll has not completed. The two sleeves keep separate calendars, so the meeting and the month move independently.

**Example:** The fed funds sleeve completes its roll on the business day before the December FOMC decision. From then on, the fed funds sleeve prices the January meeting. The inflation sleeve stays on November CPI until its own roll completes before the November CPI release in December. For those days, RFED is the implied rate after the January meeting minus implied November inflation.

### 3.4 Next reference period

The next reference meeting is the next scheduled FOMC meeting that passes Section 3.2. The next reference month is the next listed month that passes Section 3.2. A meeting or month that is not listed is never used.

An unscheduled FOMC meeting is not a reference period. If one occurs, the fed funds sleeve keeps pricing the current reference meeting, and any roll in progress continues on its schedule.

---

## 4. Data Sources

### 4.1 Primary data source

Each constituent event contract is marked at the published rate in Section 4.2. This methodology does not recompute a midpoint, last trade, one-sided quote, equal-weight mean of venue midpoints, or a second blend.

### 4.2 Which rate each clock uses

- 60-second indicative values use the real-time rate published under the [Adjacent Event Contract Real-Time Rate Mathematics Methodology](https://cdn.sanity.io/files/ddr9slt2/production/a85890e68d25ac741caaf256b31134318feeb647.pdf).
- Official daily values and roll steps use the reference rate published under the [Event Contract Reference Rate Methodology](https://adjacent.markets/static/adjacent-event-contract-reference-rate-methodology).

### 4.3 Official resolution

When a reference period’s official figure lands, the published rates settle those contracts. RFED does not pin either sleeve’s implied level to the official figure. By design each roll in Section 7.2 finishes at 5:30 p.m. Eastern Time on the Index Calculation Day before the scheduled FOMC decision or CPI release, so on decision day or print morning the sleeve already uses only the next reference period. Any gap between the last blended implied level and the official figure is intentional: RFED is market-implied, not a mirror of realized figures. RFED still publishes 100 minus the difference of the two sleeve implied levels.

### 4.4 Published values

RFED publishes 100 minus the implied real rate, where the implied real rate is the fed funds sleeve implied level minus the inflation sleeve implied level. Adjacent may also show the implied real rate as a derived display value. It is not the official index value.

- Indicative values every 60 seconds, using the real-time rate, through the Section 6 calculation.
- An official daily value at 5:30 p.m. Eastern Time on each Index Calculation Day, using the reference rate, through the same calculation. Roll steps in Section 7.2 occur at that print.

Like short-term interest rate futures, such as CME 30-Day Federal Funds and SOFR futures, which quote 100 minus a rate, RFED rises when the implied real rate falls. A negative implied real rate puts RFED above 100. RFED uses 100 minus the implied real rate for three reasons. The official value stays positive when the real rate turns negative, which keeps it within the 0.00 floor in Section 6.6. It moves the way a price does, rising when rates fall, which is how traders already read rate futures. And a future, perpetual, or fund can reference the official value directly, with no conversion.

If a sleeve has no available rate, that sleeve keeps its last implied level. RFED continues to publish.

---

## 5. Weighting Methodology

### 5.1 Sleeve aggregation

The two sleeves enter the implied real rate with equal additive weight in percentage points, the fed funds sleeve with a positive sign and the inflation sleeve with a negative sign. The official index value is 100 minus the implied real rate:

`FF̂_t = UB̂_t - 0.125`

`RR̂_t = FF̂_t - CPÎ_t`

`RFED_t = 100 - RR̂_t`

**Example:** With an implied upper bound of 4.38 and implied CPI of 3.39, `FF̂_t` is 4.26, `RR̂_t` is 0.87, and RFED is 99.13. Section 5.2 shows where those inputs come from.

A hat means the value is market-implied, not the official figure. `UB̂_t` is the implied upper bound of the federal funds target range. `FF̂_t` is the implied federal funds rate, expressed as the midpoint of the target range. `CPÎ_t` is implied headline CPI year-over-year. `RR̂_t` is the implied real rate, the derived display value. Each sleeve may itself be a roll-weighted blend of the current and next reference periods under Section 7.2.

### 5.2 Live 50% bracket

Each sleeve’s implied level, for the current reference period, is as defined in [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology) (Implied Level, Section 6A), using the published rates in Section 4. RFED locks price interpolate.

**Worked example:** The numbers are illustrative.

- **Strike mapping:** A venue lists the upper bound above 4.00% at 0.72 and above 4.25% at 0.30. On the 25 basis point grid, those are the upper bound at least 4.25% at 0.72 and at least 4.50% at 0.30.
- **Fed funds sleeve:** K is 4.25% at 0.72 and K+1 is 4.50% at 0.30. Price interpolate is 4.38. The target-range midpoint is 4.26.
- **Inflation sleeve:** CPI K is 3.3% at 0.80 and K+1 is 3.4% at 0.46. Price interpolate is 3.39.
- **Implied real rate:** 4.26 minus 3.39 is 0.87.
- **RFED:** 100 minus 0.87 is 99.13.

---

## 6. Index Calculation

Each sleeve implied level is as defined in [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology) (Implied Level, Section 6A). RFED uses price interpolate. This section states the target-range midpoint, the implied real rate, the 100 minus convention, the 5:30 p.m. Eastern Time official window, the rolls, and the other product rules.

### 6.1 Inception

RFED is published in index points, equal to 100 minus the implied real rate in percentage points. The first official value is 100 minus the implied real rate at the inaugural official window. Adjacent publishes the inaugural date in a notice.

### 6.2 Formula

Each sleeve implied level is the price interpolate in Section 6A of [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology), applied as described in Section 5.2. The fed funds sleeve subtracts 0.125 from the implied upper bound. During a roll, that sleeve uses the blend in Section 7.2 instead.

`RR̂_t = FF̂_t - CPÎ_t`

`RFED_t = 100 - RR̂_t`

Indicative values use the real-time rate. Official daily values and roll steps use the reference rate at 5:30 p.m. Eastern Time.

### 6.3 Intraday marks

Every 60 seconds, indicative values re-select each sleeve’s 50% bracket under Section 6A from the real-time rate, apply price interpolate, and recompute the implied real rate and RFED.

### 6.4 Resolution treatment

When a reference period’s official figure lands, the published rates settle those contracts. RFED does not replace that sleeve’s implied level with the official figure. Under Section 7.2 the sleeve is already 100% on the next reference period by decision day or print morning. If a date change leaves a sleeve mid-roll when the outgoing period’s contracts settle, finish the remaining Section 7.2 steps into the next reference period. Hold the last valid implied level for the outgoing period. Do not recompute it from contracts that have already started settling. Do not pin to the official figure. A landed decision or print does not, by itself, force an immediate full move onto the next reference period outside the published roll schedule.

### 6.5 Last valid implied

If a sleeve has no listed strike for its current reference period, no next reference period, or no available rate, RFED holds that sleeve’s last valid implied level and continues to publish. The index is not halted solely because one sleeve is thin, late to list, or missing a meeting or month.

When strikes are listed but no pair brackets 50 cents, the sleeve does not hold. It uses the edge rules in Section 6A of [Adjacent Event Contract Index Mathematics Methodology](https://adjacent.markets/static/math/methodology): the midpoint of the two lowest strikes if every strike is below 50 cents, the midpoint of the two highest strikes if every strike is at or above 50 cents, or the single strike if only one is listed.

When a valid next reference period exists and passes Section 3.2, that sleeve moves fully onto that next reference period on the next roll or calculation day. There is no retroactive five-step catch-up.

### 6.6 Floor, upside, and rounding

No official value is published below 0.00. A print of 0.00 is a continuing official value. RFED reaches 0.00 only if the implied real rate reaches 100 percentage points. There is no methodology ceiling. Index levels and the implied real rate are expressed to two decimal places.

### 6.7 Performance convention

A one-point rise in RFED is a one percentage point fall in the implied real federal funds rate. A product that marks to RFED sets in its listing terms how a point move translates into P&L.

---

## 7. Index Maintenance

### 7.1 Update schedule

- **Indicative values:** every 60 seconds using the real-time rate.
- **Official daily value and roll steps:** 5:30 p.m. Eastern Time on each Index Calculation Day using the reference rate.
- **Index Calculation Day:** a weekday, New York. If a scheduled FOMC decision date or BLS CPI release date moves, that sleeve’s roll window moves with it.

### 7.2 Regular roll

Each sleeve rolls on its own schedule, keyed to that sleeve’s scheduled official event. The fed funds sleeve is keyed to the scheduled FOMC decision for the current reference meeting. The inflation sleeve is keyed to the scheduled BLS CPI release. The last step is 5:30 p.m. Eastern Time on the Index Calculation Day before that scheduled event. By decision day or print morning the sleeve uses only the next reference period.

Each roll has five Index Calculation Day steps at 5:30 p.m. Eastern Time, current reference period to next: 80/20, 60/40, 40/60, 20/80, 0/100. Start is four Index Calculation Days before the last step, so the five steps are the last step and the four Index Calculation Days preceding it.

**Example:** if the last step is Tuesday, the steps run from Wednesday of the prior week through Tuesday: 80/20, 60/40, 40/60, 20/80, then 0/100 on the Index Calculation Day before the decision or release.

The blend is of implied levels:

`x̂_t(sleeve) = w_t × x̂_P + (1 - w_t) × x̂_(P+1)`

`P` is the current reference period. `P+1` is the next reference period. `w_t` is the current-period weight for that step (0.80, 0.60, 0.40, 0.20, then 0). For the fed funds sleeve, `x̂` is the target-range midpoint of each meeting.

The two roll windows run independently. When an FOMC decision and a CPI release fall within a few days of each other, both sleeves may be mid-roll on the same Index Calculation Days.

**Example:** The numbers are illustrative.

- **Fed funds sleeve:** on the first roll step, 80% current reference meeting and 20% next reference meeting. The current meeting midpoint is 4.26 and the next meeting midpoint is 4.06. That sleeve is `0.80 × 4.26 + 0.20 × 4.06 = 4.22`.
- **Inflation sleeve:** still 100% on the current reference month at 3.39.
- **Implied real rate:** 4.22 minus 3.39 is 0.83.
- **RFED:** 100 minus 0.83 is 99.17.

The current reference period normally settles after the roll ends. If its contracts start settling before the roll finishes, RFED holds the outgoing period’s last valid implied level and completes the remaining steps into the next reference period, so the index path stays continuous. It does not recompute the outgoing level from settling contracts or pin it to the official figure. If no valid next reference period is listed, the sleeve holds its last valid implied level until one is.

An unscheduled FOMC meeting does not start, stop, or shorten a fed funds roll. The fed funds sleeve keeps pricing the current and next reference meetings, whose rates reprice to the new decision.

### 7.3 Market disruptions and data failures

When a rate is unavailable, RFED holds the last valid rate and the last valid implied level. If a disruption makes routine rates or rules unsuitable, Adjacent with guidance from the Adjacent Index Committee (AIC) may publish indicative values, delay or temporarily suspend publication, or introduce a documented non-routine decision under [Adjacent’s governance policies](https://adjacent.markets/governance). A halted contract uses the last valid rate. It does not, by itself, halt the index.

### 7.4 Voids, amendments, and corrections

RFED does not apply venue voids, amendments, or corrected outcomes itself. Those enter only if and when the rate publishes them. The AIC determines whether a restatement is required under the [Corrections and Restatements Policy](https://adjacent.markets/static/corrections-restatements-policy) only if an RFED print was calculated incorrectly from the published rates, or if a rate is later restated.

### 7.5 Methodology review

The AIC reviews this methodology at least annually and may review it after material changes to the FOMC meeting calendar, BLS release calendars, ladder listing, or the rates layer.

---

## 8. Governance

### 8.1 Index Sponsor and Calculation Agent

Adjacent Markets, Inc. takes on Index Sponsor and Calculation Agent roles and responsibilities for RFED. Outcomes and decisions around calculations, screening, maintenance, and operations are performed by Adjacent.

### 8.2 Adjacent Index Committee

The AIC is responsible for overseeing this methodology, how it is interpreted, how it is maintained, necessary corrections, and other governance considerations. The AIC is governed by the [AIC Charter](https://adjacent.markets/static/aic-charter).

Routine implementation of this methodology does not require separate methodology change approvals.

### 8.3 Meeting Schedule

The AIC meets at least quarterly and on an as-needed basis. Reviews may be initiated for:

- Material methodology changes
- Market classification issues or questions
- Data quality issues
- Corrections or restatements
- Market disruptions
- Complaints
- Identity binds for the federal funds target range or headline CPI year-over-year
- Changes to the Section 6A scheme (price interpolate) in the mathematics methodology, the target-range midpoint convention, sleeve roll calendars, or publication clocks
- Other circumstances that may affect index integrity

### 8.4 Methodology Changes

Material changes require the process set out in Adjacent’s [Methodology Change Policy](https://adjacent.markets/static/methodology-change-policy), including impact analysis, AIC approval, and notice as applicable.

### 8.5 Conflicts of Interest

The AIC is responsible for ensuring that methodology decisions are made on the grounds of index integrity. Decisions should never be based on the economic interests of Adjacent Markets or products that reference RFED.

---

## 9. Risk Factors and Limitations

### 9.1 Last-valid and listing-gap risk

If a sleeve has no listed strike or no next reference period, RFED holds the last valid implied level and continues to publish. The published number may then be stale on that sleeve until a valid next reference period exists. One thin sleeve, or a missing meeting or month, does not by itself halt the index.

### 9.2 Live-bracket and next-decision risk

The two strikes around 50 cents are re-selected whenever prices move enough to change that pair. The published value is price interpolate on that pair. Thin books, or neighboring strikes whose prices are out of order, can move a sleeve implied level when a single strike crosses 50 cents. On the fed funds sleeve, strikes are 25 basis points apart, so a bracket change on that sleeve can move RFED by more than one on the inflation sleeve. If the market moves past the end of the listed strikes, the sleeve stops at the edge midpoint under Section 6.5, so RFED understates the move until new strikes are listed. RFED is the market’s implied reading of the next decision and the next print. It can differ from 100 minus the realized federal funds rate net of realized CPI inflation between events. On decision day or release morning the rolled-off sleeve is already on the next reference period. RFED does not jump to the official figure.

### 9.3 Reference-period mismatch

Separate sleeve rolls mean the fed funds sleeve and the inflation sleeve refer to different dates. The fed funds sleeve prices the rate after the next FOMC meeting while the inflation sleeve prices the latest twelve months of CPI. The difference remains well-defined.

### 9.4 Marking and liquidity risk

Constituent marks are the published rates in Section 4. Those rates may be unreliable or unavailable in thin, illiquid, stale, halted, or disrupted markets. If no rate is available, the index holds the last valid rate and the last valid implied level.

### 9.5 Implementation cost and uninvestability risk

The index is uninvestable and gross of costs. A product that holds event contracts, swaps, or futures, or that lists a future or perpetual marking to RFED, may face dealer availability, position limits, tracking difference, and other implementation constraints.

### 9.6 Resolution and contract risk

Resolution timing, contract voids, amendments, disputes, and rule interpretation can change the implied level and the timing of a roll.

---

## 10. Changelog

| Version | Date | Changes |
| --- | --- | --- |
| 1.0 | October 27, 2026 | Publish v 1.0 |

---

## 11. Approvals

| Role | Name | Signature | Date |
| --- | --- | --- | --- |
| Chief Executive Officer | | | |
| Chief Operating Officer | | | |

---

## 12. Legal Notices and Disclaimers

This methodology document and all related index levels, data, calculations, analytics, research, files, and other materials are provided by Adjacent Markets, Inc. and its affiliates (“Adjacent”) for informational and benchmark purposes only. They do not constitute investment, trading, legal, tax, accounting, regulatory, or other professional advice and do not constitute an offer, solicitation, recommendation, invitation, or inducement to buy, sell, hold, subscribe for, enter into, or otherwise transact in any security, commodity interest, event contract, derivative, swap, fund, note, structured product, digital asset, financial instrument, or other product. Adjacent does not act as an investment adviser, commodity trading advisor, broker-dealer, fiduciary, sponsor, promoter, issuer, underwriter, or placement agent by publishing this methodology or any related index data.

Important: Adjacent indices are not predictions. Adjacent index levels reflect market-implied prices, trading activity, source data, and methodology outputs. They are not Adjacent’s forecasts, predictions, polling data, political opinions, endorsements, investment views, or statements regarding the likelihood, desirability, or merit of any candidate, party, policy, company, event, or outcome. Index levels may diverge materially from actual outcomes and from other measures of probability, sentiment, or expectations.

It is not possible to invest directly in an index. Any third-party product, strategy, instrument, or service that references, tracks, uses, or is benchmarked to an Adjacent index is the sole responsibility of the applicable issuer, sponsor, manager, exchange, trading venue, broker, adviser, or other third party. Unless expressly stated in a written agreement signed by Adjacent, Adjacent does not sponsor, endorse, sell, promote, manage, advise, issue, underwrite, guarantee, or assume responsibility for any such third-party product or strategy, and Adjacent makes no representation that any such product or strategy will accurately track index performance, achieve any stated objective, provide positive returns, maintain liquidity, avoid loss, or be suitable for any investor or user.

Adjacent indices may reference data from prediction markets, event-contract markets, exchanges, trading venues, data vendors, public sources, and other third parties. Such data and markets may be volatile, thinly traded, fragmented, delayed, revised, interrupted, subject to contract-resolution rules, affected by regulatory changes, or otherwise outside Adjacent’s control. Adjacent may use information it believes to be reliable, but does not guarantee and may not independently audit, verify, or validate the accuracy, completeness, timeliness, availability, representativeness, or continued suitability of any source data.

Adjacent seeks to calculate and publish its indices in accordance with their applicable methodologies, policies, and procedures, but errors, omissions, delays, interruptions, stale data, calculation issues, source-data issues, and other defects may occur. Adjacent may correct, restate, revise, suspend, delay, discontinue, or republish any index level, file, dataset, methodology, or other material at any time, with or without notice, in accordance with applicable policies or as Adjacent determines appropriate. Adjacent may also interpret, amend, supplement, rebalance, reconstitute, discontinue, or otherwise modify any methodology, calculation process, constituent universe, data source, weighting scheme, eligibility rule, pricing convention, publication schedule, or related policy, including through the exercise of expert judgment or discretion where permitted.

Adjacent is not currently registered with the U.S. Securities and Exchange Commission, Commodity Futures Trading Commission, National Futures Association, or any other regulator as an investment adviser, commodity trading advisor, commodity pool operator, broker-dealer, futures commission merchant, swap dealer, designated contract market, swap execution facility, exchange, or clearing organization. Adjacent is not currently registered, authorized, recognized, or endorsed as a benchmark administrator under the EU Benchmarks Regulation or the UK Benchmarks Regulation, and Adjacent indices may not be eligible for use by EU or UK supervised entities in in-scope financial instruments unless applicable requirements are satisfied. Any references to benchmark governance or IOSCO principles, if made, should be understood as Adjacent seeking to align with relevant principles, not as a certification, registration, authorization, or regulatory endorsement.

All Adjacent materials are provided “as is” and “as available.” To the maximum extent permitted by applicable law, Adjacent disclaims all express, implied, statutory, and other warranties, including warranties of accuracy, completeness, timeliness, availability, merchantability, fitness for a particular purpose, non-infringement, uninterrupted operation, and error-free operation. To the maximum extent permitted by applicable law, Adjacent will not be liable for any direct, indirect, incidental, special, consequential, exemplary, punitive, or similar damages; lost profits; lost opportunity; trading losses; investment losses; business interruption; loss of data; legal fees; expenses; or other losses arising from or relating to this methodology, any Adjacent index, any index level, any source-data issue, any correction or restatement, any methodology change, any third-party product, or any use of or inability to use Adjacent materials, even if Adjacent has been advised of the possibility of such damages. Nothing in this disclaimer is intended to limit or exclude liability, rights, obligations, or remedies that cannot lawfully be limited or excluded under applicable law.

© 2026 Adjacent Markets, Inc. All rights reserved. Adjacent, Adjacent Markets, Adjacent index names, Adjacent product names, Adjacent service names, and related names and logos are trademarks or service marks claimed by Adjacent Markets, Inc. These materials and all Adjacent indices, data, methodologies, and related content are owned by or licensed to Adjacent and may not be copied, modified, reverse engineered, redistributed, reproduced, republished, sold, licensed, used to create derivative works, used as the basis for a financial product, used as a benchmark for a product or strategy, or stored in a database or retrieval system for commercial purposes except as expressly permitted by Adjacent in writing.